Demolition works at The Grandeur, Kowloon Tong

The Grandeur — residential renovation at 23 Grampian Road

On-site photographs from construction to completion in Kowloon Tong.

The Grandeur project overview

A Kowloon Tong home from strip-out to handover.

CraftInsignia renovated this residence at The Grandeur, 23 Grampian Road. The galleries show completed work and work in progress, including demolition on site, for comparison with the final interior.

The Grandeur is a low-density Kowloon Tong estate with just 28 flats. Larger homes involve more work, trades and junctions. Finishes and material choices require design and construction to be closely coordinated. See Renovation and interior design services, or browse all renovation projects。

Estate
The Grandeur
District
Kowloon Tong
Address
23 Grampian Road
Project type
Residential renovation

The Grandeur project facts

Project details and photographic coverage.

EstateThe Grandeur
Address23 Grampian Road, Kowloon Tong
Property typeResidential flat
Project typeResidential renovation
Photographic coverageCompletion and progress photographs, including strip-out
Related serviceWhole-home renovation、tiling and masonry、Bespoke joinery and furniture
Enquire about similar workContact CraftInsignia

The Grandeur estate information

Estate background can help assess renovation needs.

Estate nameThe Grandeur
Address23 Grampian Road, Kowloon Tong
Estate typePrivate residential estate
DeveloperChina Overseas
Occupation2012
Blocks and flatsTwo blocks with 28 flats; 14 per block and two per floor
Saleable areaApproximately 2,102–2,218 square feet
Nearest MTR stationSung Wong Toi station

Figures from public estate records describe the estate as a whole, rather than this particular flat.

Planning larger residential interiors

Larger properties demand coordinated planning and site management.

Design considerations

  • Public and private zones: Separate circulation through living and dining areas, bedrooms and workspaces.
  • Plan the layout first: Partitions, circulation and storage come first so the finished space works in daily life.
  • Layered lighting: A single source can flatten a large room. Coordinate fittings with daylight.
  • Consistent materials and colours: Coordinate floors, walls and cabinetry across rooms.
  • Storage categories: Allow for clothes, general storage and display with cabinets fitted around beams and air conditioners.

Construction considerations

  • Trade sequencing: With more rooms and bathrooms, schedule wet trades, services, joinery and painting to avoid delays and rework.
  • Multiple bathrooms: Waterproof each bathroom and form drainage falls before tiling and installation.
  • Service points: Confirm sockets, lights, supplies and drains before closing walls or tiling.
  • Cabinet dimensions: Remeasure finished walls, floors and ceiling before production.
  • Finishes and levels: Long lines make uneven cabinet gaps, tile joints and skirting more apparent.

We coordinate design, structural planning and construction. Read about our approach at About CraftInsignia and about design and construction roles at how design and renovation work together. Cabinets are made in Our workshop. Materials can be compared at our Kwun Tong showroom. For sintered stone see Sintered-stone furniture。

. These general considerations are not an itemised record of this flat.

Construction from alterations to completion

Whole-home renovation usually covers demolition, wet trades, services, joinery, painting, cleaning and handover.

01

Alterations

Remove the old finishes and fittings to expose the flat’s condition.

02

Plumbing and electrical

Install hot and cold pipes and electrical circuits before closing walls and tiling.

03

Wet trades

Level floors, render walls, waterproof and tile floors and walls with finished edges.

04

Bespoke joinery

Once dimensions are confirmed, cabinets are made in the workshop and installed on site.

05

Painting

Skim, sand and apply emulsion to walls and ceilings.

06

Cleaning and handover

Check joint finishes, levels and functions before handover.

Reading construction photographs

  • Demolition: Look for thorough removal and a tidy site.
  • Tile installation: Look at joint alignment and edges at corners.
  • Completion: Check how cabinets meet walls and ceilings and how materials combine.

Checks and regulations before alterations

Confirm what can be altered and who must undertake it before work starts.

Before alterations

  • Check drawings: Determine whether walls to be removed or altered are structural.
  • Check estate rules: Ask management about working hours, deliveries and debris removal.
  • Define the scope: List alterations and retained elements at quotation stage.

Regulatory requirements

Government guidance treats ordinary plastering, tiling finishes and sanitary fixture repairs or replacements as exempted works. Applicable minor works require prescribed professionals and/or registered contractors. Electrical works require registered contractors and workers, and changes to inside water services are regulated under the Waterworks Ordinance. See regulatory requirements for renovation。

Renovation from measurement to handover

We break each design down into work that can be carried out on site.

01

Site measurement

We assess the flat, services and household routines before discussing feasible changes.

02

Quotation

The quotation sets out alterations, materials and trades to reduce disputes over extras.

03

Site management

Tiling, plumbing, electrical work, joinery and painting follow an agreed sequence, with access for inspection.

04

Inspection and handover

We check joints, levels and function with the owner before handover.

The Grandeur renovation FAQs

Questions about this project and similar homes.

Where is The Grandeur?

At 23 Grampian Road, Kowloon Tong. Developed by China Overseas and occupied from 2012, it has two blocks and 28 flats near Sung Wong Toi MTR station.

What work did CraftInsignia undertake at The Grandeur?

This is a residential renovation at 23 Grampian Road. The page presents completed work and work in progress photographs, including the strip-out stage.

What should I consider for a large flat?

Additional rooms and bathrooms increase services, waterproofing and joinery. Plan trades and site supervision carefully. Design public and private zones, storage and layered lighting with consistent materials and colours. See Planning larger residential interiors。

Can the same team design and construct the interior?

Yes. We handle design, structural planning and construction. At measurement we record beams, columns, pipes and headroom.

What should we check before altering partitions?

Check drawings for structural implications. Government guidance exempts ordinary plastering, tile finishes and repairs or replacement of sanitary fittings; applicable minor works require the prescribed professionals and/or registered contractors.

Where are the fitted cabinets and furniture made?

Furniture, cabinets and sintered-stone pieces are made at Our workshop. See panel and cabinet samples on floors 2–4 at 165 Hoi Bun Road, Kwun Tong, in our showroom.

How much does a similar renovation cost?

Prices depend on area, condition, scope, materials and quantity of joinery. We measure before itemising alterations, materials and trades.

Can other Kowloon Tong estates enquire?

Yes. We welcome enquiries from The Grandeur and neighbouring estates, and serve Hong Kong Island, Kowloon and the New Territories. Call or WhatsApp +852 6036 4352、+852 6633 2245, email craftins.info@gmail.com, or visit our contact page to submit the form.

Tiling work on site

Renovating in Kowloon Tong?

Enquire about site measurement and quotations at The Grandeur and nearby.

contact
WhatsApp